Maintainance works in the Karavanke tunnel

Tuesday, January 28, 2014 3:03:46 PM

In the Karavanke tunnel between 28th of January and 17th of April 2014 and between 5th of May and 16th of May 2014 maintainance works will be held. During the works, only alternative one way traffic will be possible with waiting period before the tunnel up to 30 minutes.

The closure of the tunnel for all vehicles is planed at nights between 11 pm and 4:30 am, except Sunday nights. These closures will be withdrawn the case of bad road conditions and road closures on mountainpasses between Slovenia and Austria. In the time of the tunnel closure the detour for trucks will be via Udine (I) or Graz (A), while the detour via Korensko sedlo and Ratece is allowed for cars only. (transportability of the Italian roads check  www.cciss.it.

Drivers are recommended to check the road and traffic situation on the internet side  www.promet.si or call the Traffic Information Centre on +386 1 518 8 518.

Source: DARS d.d.

 

© 2006-2019 Prometno-informacijski center za državne ceste, DARS d.d.