On the main road Žaga – Učja – Tarcento (Italy), urgent maintenance works on the retaining walls will begin on Monday, August 19, according to the Municipality of Bovec and the Italian ANAS.
On the section from the intersection in Rezija (Uccea) to Čenta (Tarcento), the road will be transportable only for vehicles up to a total length of no more than 10 meters.
From September 16 to 30, the road on this section will be CLOSED TO ALL TRAFFIC (except on Saturdays and Sundays). The detour will be arranged via Čedad.
The road from the Učja border crossing to Rezija will be normally transportable.
Source: Municipality Bovec
Posted by PIC
13. August 2024