In September, the reconstruction of the regional road and the arrangement of parking lots at the top of the Vršič pass are scheduled to begin.
During the works, between 2 September and 24 December 2024, or as long as weather conditions allow, there will be semi-closures on sections of the state roads Ruska cesta (Erika-Vršič) and Vršič-Trenta.
Traffic passing the works area will be alternating one-way with traffic lights.
Occasional full lockdowns are also planned between September 16 and December 24, but only during the week, between 7.30am and 5pm. The hours for establishing full lockdowns may also change depending on weather conditions.
A detour for all vehicles is planned on the route Kranjska Gora–Rateče–Italy–Predel–Bovec.
Source: DRSI
Posted by PIC
19. August 2024